'Trialling' is a bit of a long bow...trialling against what set of parameters? Trialling against what other contenders?
Having a play at attempting to be green for the bosses is about all the Ubco is good for.
Yes the blurb says payload 150kg, max distance 120km. But I bet those two figures are not compatible. Also, its not set up for proper off road travel...not with puny shock absorbers and tiny front fork travel.
Not completely knocking it, but having a vehicle that cannot go anywhere for 4-6 hours does not fit any tactical envelope I can think of.
Yes, it may have some value back in the rear, inside a logistic base for putting to and fro attending O groups or getting to the mess tent first.
But SF recce asset in front of recon assets yeah, nah. I know for a fact the petrol powered enduro bikes our SF guys use can carry that weight if necessary, but over the most gnarly terrain, for at least 100km. Chrome molly frame, 300mm of suspension travel, and in 2 minutes the bike would be fueled up ready to do it all again! (not sure if the rider would though!!!)
Its the Army FFS. Not DoC or some District council wanting to be seen as uber green. It needs to work well all of the time. And petrol and diesel power is the only tried and tested motive power we have at this point it time.
Bookmarks