A very quick look also has a 2" steel pipe giving 1.8m of head via frictional losses at 3.5m/s for 30m3/hr. This maybe an ask for the pump if you have it trying to suck up the hill as most need +ve NPSH to function correctly. This does not allow for any valves or a check in the line which you will most probably need to keep it primed. If you can leave the pump at the creek it would be easier.
Bookmarks