Bit of a updated plan.
Couple of changes to add in another range (30m wide by 60 long), sorted some berm height issues, etc..
Still haven't got the baffles drawn in (basic outline done of where and how big though, and we should be certified up to 7000 joules - still need the detail design done to confirm the thickness which will determine final joule level) or the range buildings...... but should be soon.
Dirt being moved now...
Bookmarks