How is the project @Chilli_Dog?
How is the project @Chilli_Dog?
An itch ... is ... a desire to scratch
Almost done, I need to make a spacer to go between the wood work and the back of the suppressor tube, because of the angle on the back of this it needs to be relived at the front so it can be taken off. I also need to nail the small metal strip between the two bits of front wood, I kind of forgot about this as I would have just epoxyed it on but I have already started oiling the wood so will need some little nails. I do still need a sling swivel if anyone has one.
Hopefully Ill give it a go this weekend.
![]()
Bookmarks